Article | REF: G2564 V1

Management plan

Author: Stéfan COLOMBANO

Publication date: October 10, 2010

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

15. Management plan submitted to the authorities

The whole of the above-mentioned approach, in particular source control, impact control and the cost/benefit balance justifying the management scenario(s), must be presented in a report which must include the following elements:

  • summary of previous diagnoses ;

  • summary of the choice of management scenarios: source control, impact control, cost/benefit balance;

  • summary of management operations :

    • dimensioning calculations,

    • completion drawings (layout of works and structures, etc.),

    • summary of materials excavated and, where applicable, processed (traceability: BSDI, input materials, etc.),

    • reports on periodic checks carried out on site (emissions,...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Environment

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Management plan submitted to the authorities
Outline