7. Main results of the study and revision of the master plan
7.1 Main results of the study
The various study reports should enable us to present all the results of the studies, and to provide the project managers with all the information they need to develop the networks.
Elements for presenting results relating to the final target are given in paragraph 5.4
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Electricity networks and applications
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Main results of the study and revision of the master plan
Bibliography
Also in our database
Websites
Regional grid connection schemes for renewable energies (S3REnR) :
Standards and norms
- Operations on electrical structures and installations and in an electrical environment – Electrical risk prevention - NF C 18-510 - 2012
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference