9. Appendice
9.1 Principle of a works development strategy
This appendix illustrates the realization of a strategy for a relatively dense rural area. It should be noted that transformation power, by the end of the study, is available at the three source substations in the study area. Furthermore, the schematic representations used below do not include all networks.
The initial state is given by the network diagram and the table of characteristics of the various MV feeders supplying the study area (figure 7 ).
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Electricity networks and applications
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Appendice
Bibliography
Also in our database
Websites
Regional grid connection schemes for renewable energies (S3REnR) :
Standards and norms
- Operations on electrical structures and installations and in an electrical environment – Electrical risk prevention - NF C 18-510 - 2012
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference