Article | REF: D4211 V2

Master Plans for the Development of MV Electricity Distribution Networks

Author: Alain COIFFIER

Publication date: June 10, 2021, Review date: June 15, 2021

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Overview

Français

ABSTRACT

The HV/MV (High and Medium Voltage) substations and MV networks master plan is an important challenge for the distribution utility or company. Its study is an opportunity to define objectives for the quality and security of electricity supply. Its use ensures the efficiency of the proposed investments in the short and medium term. Its development is structured in several stages, the major ones being the achievement of the 30 years target and the implementation of the MV network development strategy in order to reach the final target.

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

  • Alain COIFFIER: Engineer from the Conservatoire National des Arts et Métiers (CNAM) - Former Head of Department, Network Division, ERDF (Électricité Réseau de Distribution France)

 INTRODUCTION

The development of the public electricity transmission and distribution network represents a major investment, and the equipment built has a very long lifespan of around 40 years. It is therefore imperative that a coherent, economically optimized and robust approach be taken to the necessary upgrades. Each network operator, whether transmission or distribution, is therefore required to develop a forward-looking vision of the evolution of its network. Obviously, these visions must be coordinated within a given territory. These forward-looking visions enable us to design the future network with a view to the future, integrating new technologies and new user expectations at an early stage. This is the logic of a master plan. This master plan will then serve as a reference for all the work that will be decided upon as new users arrive, in response to increased consumption, to improve quality or to compensate for the obsolescence of the network's oldest components.

All electricity companies are developing a similar approach, which enables us to understand how the long-term vision fits in with short-term decisions. This article illustrates the approach adopted in France by the incumbent distributor Enedis.

The master plan is drawn up in accordance with the distribution company's policies and technical rules, and consists mainly of a long-term target and the best strategy (successive operations to move from one network situation to another) for developing distribution facilities leading to this target. The structures concerned by the master plan are source substations and MV networks; LV networks are excluded from these studies.

The existence of the master plan makes it possible to :

  • guarantee the efficiency of investments, by integrating both the time dimension (long-term optimization) and the diversity of their purposes (connection of loads and decentralized generation, reinforcement, renewal, quality of supply, etc.);

  • forecast and evaluate the investments to be made over a 10-year period (creation of source substations and MV feeders, renewal and reinforcement of existing structures, etc.);

  • estimate quality-of-supply levels for different timeframes, based on allocated investment volumes;

  • check the evolution of power supply security in the event of exceptional events;

  • streamline investment decision-making by reducing the number of solutions to be studied, while ensuring long-term consistency;

  • facilitate dialogue with all parties involved in the construction, operation and management of MV distribution facilities;

  • ...
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

KEYWORDS

quality of supply   |   target network   |   security of supply   |   MV and LV networks   |   HV/MV substations


This article is included in

Electricity networks and applications

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Master plans for the development of electricity distribution networks
Outline