Article | REF: C3844 V1

Non-collective sanitation techniques and management - Controls

Author: Jean-Marc BERLAND

Publication date: February 10, 2012

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Inspection of new installations

2.1 Design conformity

This control is carried out through Spanc's verification of the application file for the installation of a non-collective sanitation system, which must be submitted to the mayor by the owner wishing to carry out such work.

  • For Spanc to be able to give a detailed opinion, this authorization request must provide the following information and documents:

    • general information identifying the applicant :

      • date of request,

      • number and date of the planning certificate,

      • number and date of building permit application (except in the case of rehabilitation),

      • ...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

The finishing and equipment of the building

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Inspection of new installations