Article | REF: TBA239 V1

Site safety

Author: Pierre SERIN

Publication date: May 10, 2021 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    4. Site prevention during the design phase – Example of a "small structure" or a single-family home

    Someone has decided to build their own home. He or she has chosen from among the builders of individual homes, who may be craftsmen or small building firms, and who may or may not be members of the CAPEB.

    This person is therefore the "project owner – MOA", i.e. the person for whom the construction is to be carried out, and as such is responsible for ensuring construction safety from design to acceptance. As such, they are responsible for ensuring the safety of the building from design to handover, and for coordinating SPS (safety and health protection). She will therefore have to follow a procedure.

    4.1 First phase: from project to signature of construction contract

    • Designation of the competent person to carry...

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Preparing for construction

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Site prevention during the design phase – Example of a "small structure" or a single-family home
    Outline