3. Checking warranty compliance
After the test, in accordance with the program agreed between the parties, it is necessary to decide on the conformity of the performance obtained with the guaranteed performance. Often, large sums of money are at stake, due to the release of payment terms linked to the acceptance of equipment, and schedules are generally tight (indeed, the test takes place at the end of the machine's production cycle). It is therefore important to avoid frequent confusion or misunderstandings between individuals who do not have the same objectives, sometimes not the same technical culture or sensibility, and often not the same language.
The standards specify the method for comparing guaranteed test points (figure
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Hydraulic, aerodynamic and thermal machines
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Checking warranty compliance
References
In Engineering Techniques
Standardization
French Standards Association (Afnor)
- Technical specifications for centrifugal pumps – Class 1. - NF EN ISO 9905 - 1-1998
- Rotodynamic pumps – Hydraulic function tests for acceptance – Levels 1 and 2. - NF EN ISO 9906 - 6-2000
- Technical specifications for centrifugal pumps – Class III. - NF EN ISO 9908 - 3-1998 ...
Theses
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference