Article | REF: AG3153 V1

Project management - The case of an oil refinery

Author: Jean LE BISSONNAIS

Publication date: October 10, 2001

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

1. Background

1.1 Description of project and site

In the light of feasibility and profitability studies, the Typol oil company has decided to build a new refinery for one of its subsidiaries (Philékistan Typol Co), headquartered in Philékistan, on a greenfield site near Kumpt Harbour, a major port with a quay and sufficient handling facilities to unload all imported materials. It has been agreed with the local authorities that crude oil could subsequently also be unloaded at Kumpt Harbour, on an available but currently unequipped quay; a pipeline will have to be built from the port to the site, which is not a problem as the right-of-way has long been reserved. Finished products will have to be evacuated by road, using the trucks of local distributors.

  • ...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and production

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Background