5. Technique for treating coal shale with road binder
The results obtained from the first test plots, carried out using a pulverizer, rapidly confirmed the laboratory studies. As a result, the initially envisaged use of a fixed plant was abandoned in favor of mobile workshops.
-
Workshop organization
Depending on the application, the shale was processed :
or for excavation (transport of treated materials);
or backfill (transport of raw materials).
For the subgrade of the multimodal platform treated with 6% excavated material, the treatment workshop was organized as follows, in 40 cm thick passes:
use of a scarifier to decompact the soil and detect any mining waste (timber, scrap metal, conveyor belts, etc.);...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Sustainable construction
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Technique for treating coal shale with road binder