2. Geographical and historical context
The Delta 3 multimodal platform is ideally located at the center of a triangle formed by three major transport routes: the A1 Paris-Lille freeway to the west, the Haute Deûle canal to the south, and the Paris-Lille and Lens-Ostricourt rail lines to the northeast.
It is located on more than 300 hectares of land vacated by the closure of the Agglonord coal ball factory, along the eastern flank of the "116/117" slag heap, overlooking the plain from a height of around 60 meters, and on agricultural land. The site is located at the heart of the Nord-Pas-de-Calais mining history, a stone's throw from the former Oignies and Hénin-Carvin mines.
The presence of this slag heap was of vital importance to the project, as the prefectoral decree made the project owner the operator of a tabular zone located...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Sustainable construction
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Geographical and historical context