4. ERTMS equipment production
4.1 General
Deployment of the ERTMS Niv2 system requires ground-side installation of RBCs interfaced with :
existing interlocking systems ;
ancillary equipment necessary for their operation;
with GSM-R via MSC.
On the mobile side, EVC equipment is also interfaced with the specific environment required for its operation (HMI, tachometer, radar, power supply, isolation switch, emergency brake controls, etc.).
Each rail infrastructure, and each rail operator, deploys the ERTMS system in its own area (trackside or onboard), according to its own criteria, in compliance with the SRS 2.3.0 standard.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Electricity networks and applications
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
ERTMS equipment production
References
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference