1. Procedure prior to the construction of an overhead line

1.1 Impact study

The procedure prior to the construction of an overhead line consists of studying, under the supervision of the administrative authorities, the environmental parameters likely to be affected by the construction of a line.

The impact study begins with EDF sending an economic justification file for the planned line, together with a proposed study area, to the DIGEC (the French Ministry of Industry's Gas, Electricity and Coal Department) for very-high-voltage (VHV) lines, and to the DRIRE (the French Regional Department for Industry, Research and the Environment) for high-voltage lines.

If the project is accepted, an initial consultation is launched under the aegis of the prefect, in the presence of elected representatives,...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Electricity networks and applications

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Procedure prior to the construction of an overhead line