Article | REF: TBA3022 V1

ERP fire safety – Type U establishments - Care facilities

Authors:

Publication date: December 10, 2014, Review date: May 11, 2020

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

7. Heating – Ventilation (article U 27)

§ 1 Heating and ventilation systems installed in accordance with articles CH 1 to CH 43 (§ 1 to 8 of [TBA 3 005] ) are permitted.

§ 2. electrical generation-emission devices with a surface temperature not exceeding 100°C, installed in accordance with the provisions of articles CH 44 and CH 45 (§ 8.1 and 8.2 of

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Heating – Ventilation (article U 27)
Outline