5. Organization of heavy work

Level 4 or 5 jobs (§ 1.4 ), such as major overhauls of complete units, require special organization. Task networks are often used. The job is broken down into elementary tasks of known duration, and a chronological relationship is established between the tasks. These are then arranged in a network where the earliest and latest times are shown for each task, thus determining a critical path, or sequence of operations for which there is no available time...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Hydraulic, aerodynamic and thermal machines

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Organization of heavy work