1. Origins and objectives of the SRCM process developed by EPRI
1.1 Origins
Following the publication of the RCM report by Nowlan and Heap in 1978 in the aeronautical field, the Electrical Power Research Institute (EPRI), funded by American electricity producers, transposed this method to the nuclear industry as early as 1983 in pilot experiments for various nuclear power plant systems. The nuclear operators concerned found that applying the original RCM method required too much time and resources, leading them to suspend its application. EPRI then looked for alternative methods to reduce the cost and development time of a RCM analysis,...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Safety and risk management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Origins and objectives of the SRCM process developed by EPRI
Bibliography
Software tools
APT, January 2016, Preventance. Asset Performance Technologies 400 Gold Ave SW, Suite 508, Albuquerque, NM 87102, USA
Standards and originals
NF EN – Maintenance terminology, NF EN 13306, June 2010
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference