5. Conclusion
The SCRM method defined by EPRI for power plant maintenance largely respects the fundamental principles of the original RCM reliability-based maintenance method defined in 1978 by Nowlan and Heap. To reduce development time and associated resources, SRCM groups the original RCM procedure into five steps: identification of important functions, analysis of critical components, analysis of non-critical components, comparison of maintenance tasks and their implementation. SRCM makes extensive use of feedback and expert advice from specialists in equipment design, operation and maintenance. A fundamental feature of SRCM is the use of generic frameworks developed for different types of component. They contain conditional maintenance tasks, scheduled maintenance tasks and monitoring tasks, as well as their completion periods according to criticality criteria. The proposed criteria relate to the...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Safety and risk management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Conclusion
Bibliography
Software tools
APT, January 2016, Preventance. Asset Performance Technologies 400 Gold Ave SW, Suite 508, Albuquerque, NM 87102, USA
Standards and originals
NF EN – Maintenance terminology, NF EN 13306, June 2010
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference