Article | REF: AG3256 V1

Engineering contracts - Appendix 2: Technical provisions (part 2)

Author: Gilles CASTAN

Publication date: July 10, 2005

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

1. Contract performance phases

1.1 Product design phases

Example

General comment:

The importance of design activity is sometimes underestimated, even though 70% to 90% of the costs of a complex Product are the consequence of decisions taken in the early phases of its specification and design. Faced with a sharp increase in the complexity of the Products (especially systems) to be developed, it is essential to devote the effort and attention that the specification phases (see appendix 2, part 1) and the design phase (see appendix 2, part 2, part 3) require. ) and design merit by formalizing and controlling :

  • expression and analysis of requirements (mission, functions, performance,...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Design and production

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Contract performance phases