7. Rules of use
Commissioning
If the crane (or gantry crane) is large enough to be transported fully assembled (see road jig), it will be installed in a single operation. In all other cases, the equipment will have to be assembled on the ground before it can be installed, so always provide a clear area for this preparation. This operation requires lifting equipment ranging from a simple hoist installed on the roof structure to a truck-mounted or self-loading crane weighing several tons, so you need to provide access for these machines.
Maintenance and operating manuals
Each bridge or gantry must be accompanied by an instruction manual giving the following information:
instructions for commissioning: installation, assembly,...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Logistics and Supply Chain
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Rules of use
In Engineering Techniques
Regulations - Standardization
-
FEM (European Federation of Materials Handling) recommendations
Section 1 – Heavy lifting and handling equipment.
Section 9 – Series hoists.
FEM 1001. (3rd edition) Rules for the calculation of lifting devices....
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference