5. Projects
5.1 Key players
Institutional partners, apart from their regalian or financial role, are essential to the technical validity of projects and must be approached as early as possible in the studies:
the Val-d'Oise Departmental Directorate for Territorial Affairs (DDT95) handled the administrative procedures relating to the environmental code in the context of water policing;
The French Biodiversity Agency (AFB), formerly known as ONEMA, was also involved in the Vignois project, providing expertise on the geomorphology of the watercourse, in close collaboration with the DDT95 and the Seine-Normandie water agency;
the Seine-Normandie Water Agency (AESN), as a financial and...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Ecological engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Projects
Bibliography
Websites
Virtual tour of the Sarcelles site: http://www.siah-croult.org/streetview-sarcelles-web/
Renaturation of the Croult and creation of a wetland/floodplain over 12 ha in Gonesse (95): https://goo.gl/Fyp2Z1
Restoring the...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference