5. Use of BAT
5.1 Periodicity of review of operating reports
In future, it seems that the periodic revision of the operating report could be initiated as soon as a BREF is modified. If such a practice becomes a reality, however, it will have to take into account the case of plants hosting several installations listed in Appendix 1 of the 2004 ministerial order, otherwise these plants will be required to revise their operating reports on an almost permanent, and therefore pointless, basis.
SCROLL TO TOP5.2 BAT a decision-making tool, not a regulatory...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Use of BAT
Bibliography
Regulations
Non-exhaustive list
Titre I er du Livre V du Code de l'environnement relatif aux Installations classées pour la protection de l'environnement.
IPPC (Integrated Pollution Prevention and Control) Directive no. 96/61/EC of 24/09/1996 concerning integrated pollution prevention and control.
Directive 2008/1/EC of January 15,...
Websites
EIPPCB European IPPC Bureau
Ineris (regulatory watch)
European regulations
...Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference