
4. Operation and maintenance
4.1 Monitoring and controls
Monitoring and controls can be summarized in 6 main phases; the lifespan of the furnace, which can reach 12 to 15 years, depends on the respect of these stages:
daily monitoring of electricity consumption, particularly during the weekend;
daily monitoring of the electrical power absorbed by the inductor and the oven;
weekly maintenance of liquid metal inlet and outlet traps;
weekly temperature checks on the furnace casing ;
monthly cleaning of bath surface ;
annual inspection of coating by infrared thermography.
Correlation...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference
This article is included in
Metal forming and foundry
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Operation and maintenance
Bibliography
Suppliers (non-exhaustive list)
-
Calderys (Imerys Group) :
http://www.calderys.fr
-
SAS furnaces and processes :
http://www.foursrefsas.com
-
Refractory Supply Department :
http://sfr-refractaire.com
EKW France, 15 rue Chabrol 75010 Paris...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference