2. Project progress
2.1 Administrative procedures
They are linked to the country's regulations for obtaining :
administrative title (prefectoral authorization if power is less than 4,500 kW, or concession above that);
specifications or water regulations ;
local authorizations (building permits, right-of-way permits, sales contracts, etc.).
An impact file is required to apply for a title. The study required to draw up this file can take up to a year to complete, so it should be commissioned from a specialist company as soon as the decision to proceed has been taken.
Depending on the project owner's capabilities, the project can be...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Electricity networks and applications
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Project progress
Bibliography
Directory
• Professional organizations
ADEME: French Environment and Energy Management Agency
Provides all the information, guides and advice you need to prepare your files.
France Hydro-Electricité: Union of hydropower professionals
66 rue de la Boètie – 75008...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference