1. Impact of generation connected to the PDS on the HVB network

The DSO is, vis-à-vis the TSO, a user. The conditions for connecting or modifying the characteristics of distribution system operators' facilities connected to the transmission system are governed by the provisions of Decree 2003-588 of June 27, 2003 and the Order of October 6, 2006 (see § 2.3.1 of [D 4 241] ). These texts contain provisions relating to :

  • connection and design of DSO installations involving distributed generation;

  • the safety of the power system in the presence of distributed...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Electricity networks and applications

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Impact of generation connected to the PDS on the HVB network