5. Operation: checking, servicing, maintenance
5.1 Checking during commissioning
These checks, also known as initial inspections, consist of visual examinations, tests and measurements, to ensure that installations comply with regulations and standards.
Schematics and diagrams must be provided at the time of the initial inspection, showing in particular :
the nature and composition of the circuits (points of use served, number and cross-section of conductors, type of pipes);
type and cross-section of conductors ;
circuit length ;
the nature and type of protective devices ;
location, type, rated or set current of protective...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Preparing for construction
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Operation: checking, servicing, maintenance
Websites
Energy suppliers http://www.energie-info.fr
Organisme professionnel de prévention du bâtiment et des travaux publics (OPPBTP) (Professional organization for building and public works prevention) http://www.oppbtp.com/
Standards and norms
- Postes de livraison alimentés par un réseau de distribution publique HTA (jusqu'à 33 kV) - NF C13-100 - 04-15
- High-voltage electrical installations – Supplementary rules for production sites and industrial, tertiary and agricultural installations (classification index: C13-200) - NF C13-200 - 09-09
- Low-voltage electrical installations – Title 7: Rules for special installations and locations, updated June...
Regulations
Guide UTE C 15-401 – January 2004 – Low-voltage electrical installations – Practical guide – Generators – Installation rules
Decree no. 88-1056 of November 14, 1988 implementing the provisions of the book II of the French Labour Code (title III Hygiene, safety and working conditions) concerning the protection of workers in establishments...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference