Article | REF: TBA547 V2

Electrical installations for construction sites and temporary facilities

Author: Williams PAUCHET

Publication date: November 10, 2016

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Determining needs

2.1 Assessment of site requirements

To optimize the design of the electrical infrastructure for a construction site, it is essential to work with the future site manager or the head of the Methods department to study the projected needs of the project. This is a kind of audit, covering the points examined below.

SCROLL TO TOP

2.1.1 Receiver census

Drawing up a list of receivers (lighting, motors, heating, low-current receivers) is not usually a problem. However, it is important not to omit power supplies...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Determining needs