Article | REF: TBA526 V1

Construction cycle. Shuttering, concreting and stripping

Author: Pierre SERIN

Publication date: May 10, 2017

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

5. Conclusion

The study of formwork rotation is very important because formwork is expensive: any error is costly and leads to a loss of time. You also need to take into account the setting time of the concrete, which enters into the calculation of the rotation cycle. This study can make or break a project, which is important for the life of the company. Every extra hour spent studying specific points saves the job site around 10 to 20 hours. Using too much formwork equipment prevents the site from being profitable, but if you don't have enough equipment, you risk delay penalties.

SCROLL TO TOP
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Conclusion