6. Glossary

Banche

Formwork-tool used to build vertical walls. Formwork panels are generally joined together in pairs (one per side), but can also be assembled in a "train" to form a longer unit, thus forming a single tool.

Tool form

A mold prepared for casting concrete, made from reusable, industrially-machined materials such as formwork panels or tables, as opposed to formwork produced by hand in a workshop or on site.

Cycle

A process that repeats itself identically a certain number of times during execution.

Fairground

Temporary manufacturing station, usually installed on a construction site, as opposed to in a specialized workshop.

Pre-slab

Prefabricated slab, approx. 7 cm...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Preparing for construction

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Glossary