5. Economic stakes
5.1 Building waste costs
5.1.1 Evaluation of disposal costs
The cost of waste disposal is estimated at between 0.5 and 7% of the cost of the lots, depending on their nature. The waste-related costs to be included in the contractor's price depend on :
the labour required for pre-sorting (or dismantling) ;
specific site installations (storage area, skips, etc.);
the effect of scale directly linked to the...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Public works and infrastructure
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Economic stakes
2. Waste tracking slips
These are the following (cf. :
the BSDI special industrial waste tracking slip;
asbestos waste tracking slip (BSDA);
inert waste tracking slip (or DIB).
4. Recommendation no. T2-2000 to public-sector clients concerning the management of waste from building sites
5. Audit forms
This paragraph describes the various audit forms, referring to § 3.11 of , for buildings prior to total or partial demolition.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference