5. Economic stakes

5.1 Building waste costs

SCROLL TO TOP

5.1.1 Evaluation of disposal costs

The cost of waste disposal is estimated at between 0.5 and 7% of the cost of the lots, depending on their nature. The waste-related costs to be included in the contractor's price depend on :

  • the labour required for pre-sorting (or dismantling) ;

  • specific site installations (storage area, skips, etc.);

  • the effect of scale directly linked to the...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Public works and infrastructure

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Economic stakes
Outline