Article | REF: C3845 V1

Management of septage

Author: Dr Jean-Marc BERLAND

Publication date: August 10, 2013

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

3. Storage area before treatment

A sewage sludge reception unit must be set up to receive and control the trucks bringing in the sewage sludge.

A system for identifying emptiers (by badge, for example) must be put in place.

It is very difficult to control the origin and nature of these materials.

Grease, pebbles, hydrocarbons and solvents are frequently present, which can lead to malfunctions or pollution in treatment units, or in the area where these materials are spread (agricultural reclamation).

This reception unit must consist of three successive stages: pre-treatment and two separate pits in series (an unloading pit and a storage pit) (see figure). 4

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

The finishing and equipment of the building

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Storage area before treatment