Article | REF: BE8575 V1

Power Plants (Plant design)

Author: Benjamin FRITZ

Publication date: June 10, 2022

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Opportunity study

The second step is to carry out a pre-feasibility study.

First of all, we carry out a pre-dimensioning of the photovoltaic system.

This means assessing the solar potential. This step involves estimating the power of the photovoltaic system in relation to the available surface area of the building or plot of land under consideration, and then the annual production of this system according to the power envisaged and the type of installation.

The output of a photovoltaic system is generally expressed in kWp, or MWp for larger systems. It depends directly on the power and number of modules installed.

Wp for watt peak.

In 2021, the most common modules will have an output of around 320 Wp and a surface area of around 1.65 m....

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Energy resources and storage

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Opportunity study
Outline