Article | REF: BE9322 V2

Urban cold network (distribution network)

Author: Renaud FEIDT

Publication date: April 10, 2017

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Technical solutions

2.1 Distribution pipes

SCROLL TO TOP

2.1.1 Installation tips

Installation methods depend on the pipe material used. Installation is easier in RFU than in RCU, due to less expansion caused by temperature variations.

Conventional installation methods can cause axial stresses on steel tubes due to frictional forces between the liner and the surrounding soil.

To control these friction forces and ensure that they remain at an acceptable level, the tubes should be surrounded by a layer...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Energy resources and storage

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Technical solutions