
5. Steam generators (SG)
5.1 Design and manufacturing
Steam generators (SGs) have come a long way, but to keep things simple, we'll distinguish between four more or less homogeneous families: on the one hand, the SGs that originally equipped the three stages – GV 900, GV 1300 and GV N4 – and, on the other, the replacement SGs.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference
This article is included in
Nuclear engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Steam generators (SG)
Bibliography
Bibliography
Also in our database
Regulations (non-exhaustive list)
Law no. 2006-686 of June 13, 2006 on nuclear transparency and safety.
Arrêté du 26 février 1974 relatif à la construction du circuit primaire principal des chaudières nucléaires à eau (JORF du 12 mars 1974).
Arrêté du 10 novembre 1999 relatif à la surveillance de l'exploitation du circuit primaire principal et des circuits secondaires principaux des réacteurs...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!

The Ultimate Scientific and Technical Reference