Article | REF: BN3765 V1

Long-term operability of La Hague plants: "corrosion" feedback

Authors: Hervé ANTONY, Pierre CHAMBRETTE, Laurent JUNOD, Valentin ROHR

Publication date: June 10, 2024

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

3. Main spent fuel dissolvers in workshops R1 (UP2-800) and T1 (UP3)

3.1 First stage of the treatment-recycling process

The first stage of the spent fuel treatment-recycling process involves shearing the fuel assemblies and dissolving the uranium and plutonium oxide pellets, while separating the structural elements of the assembly (figure 1 ).

Directly after shearing the fuel assemblies, the resulting sections are fed into the wheel dissolver (figure

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Nuclear engineering

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Main spent fuel dissolvers in workshops R1 (UP2-800) and T1 (UP3)