6. Problems relating to production
6.1 Site organization
The containment system is a specific civil engineering structure that requires the contractor to have perfect mastery of the following areas:
boiler making for the sealing skin (REP 900) and the penetrations, personnel locks and equipment buffers; this part is subcontracted to a specialist (Neyrpic or Delattre-Levivier);
concrete with good workability in difficult conditions (dense reinforcement) and sufficient compactness to ensure good gas tightness (REP 1,300-1,450);
prestressing using large cables, subcontracted to a specialist: GPN (Groupement pour la Précontrainte Nucléaire).
Standardization meant that EDF...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Nuclear engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Problems relating to production
Bibliography
References
Manufacturers. Manufacturers
Non-exhaustive list
Concrete, passive steels
All major French public works companies.
Boilermaking
Alstom http://www.alstom.com
Endel http://www.endel.fr
Design offices
...Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference