Article | REF: BM5618 V1

Geometric product specification (GPS)

Author: Jean-Hugues MARCHÈSE

Publication date: June 10, 2004

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

7. Financial aspects of tolerancing

It is accepted that 80% of the cost of a part is incurred during its design. The design office must have a budget of hours sufficient to :

  • carry out an in-depth functional analysis of the mechanism ;

  • inventory groups of functional surfaces;

  • rate each functional group internally (is each surface rated in terms of position, orientation, shape, surface state parameters and defined by its mechanical characteristics?

  • rate each functional group in relation to the others ;

  • ensure that the quotation is unambiguous;

  • ensure, during a project review with the other partners, that the specifications are realistic, particularly in terms of tolerances.

...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Mechanical functions and components

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Financial aspects of tolerancing