Article | REF: BM4290 V1

Banki-Michell turbine PRS for energy recovery and water leakages reduction

Authors: Antonietta SIMONE, Orazio GIUSTOLISI

Publication date: February 10, 2021

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

3. Modeling a PRS (Power Recovery System)

The PRS device is obtained by introducing a diffuser downstream of the impeller in traditional Banki-Michell units. This diffuser allows the flow rate to leave the impeller under pressure, enabling it to be inserted in water distribution networks with reduced pressures and losses, extended network service life, reduced treatment and pumping costs, and energy recovery.

The PRS consists of five main parts: convergent tube, nozzle, Cink control device , rotating impeller and diffuser. The Cink control device adjusts the flow rate by rotating a profiled circular segment that operates over...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Hydraulic, aerodynamic and thermal machines

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Modeling a PRS (Power Recovery System)