Article | REF: SE2090 V1

Instrumented risk management measures (IRMM) - State zero and life sheet

Author: Olivier IDDIR

Publication date: October 10, 2014

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

1. Characterization of an instrumented risk control measure (MMRI)

1.1 Context: industrial plant modernization plan

Between 2007 and 2009, the loss of containment at Ambès (January 11, 2007), Donges (March 16, 2008) and La Plaine de la Crau (August 7, 2009), with significant environmental consequences, highlighted the problem of aging facilities. Table 1 presents the causes and consequences associated with these three losses of containment.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Safety and risk management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Characterization of an instrumented risk control measure (MMRI)