Article | REF: SE1677 V1

CWA-RBIM risk- and reliability-based maintenance method

Author: Gilles ZWINGELSTEIN

Publication date: February 10, 2017

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Overview

Français

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

  • Gilles ZWINGELSTEIN: Engineer from the École nationale supérieure d'électrotechnique, d'électronique, d'informatique et d'hydraulique et des télécommunications de Toulouse (ENSEEIHT) - Doctor-Engineer - Doctor of Science - Retired Associate Professor, Université Paris Est Créteil, France

 INTRODUCTION

This article, aimed at readers with a basic knowledge of risk control and maintenance methods, presents the CWA-RCBIM risk- and reliability-based maintenance method developed in 2001 as part of the European RIMAP (Risk-Based Inspection and Maintenance Procedures for European Industry) project. It is the subject of the draft European prEN 16991 standard in 2016 (Risk-Based Inspection Framework: RBIF).

The first section presents the origins of the approach, which stems from the European community's desire to have a methodological framework for establishing risk-based inspection and maintenance programs that take into account the various European and international standards, while distancing itself from American standards such as those of the API (American Petroleum Institute).

One of the aims of this method is to make industrial plant inspection and maintenance programs more cost-effective, while maintaining or improving the safety, health of personnel, the environment and the economic performance of assets. This method is aimed at managers and engineers wishing to implement an RBIM program in industrial sectors (petrochemicals, chemicals, energy production and associated companies).

The second section presents the six essential steps for developing an RBIM risk-based inspection and maintenance program. These steps include preliminary analysis and planning, data research, data collection and validation, multi-level risk analysis, decision making and action plans, implementation and feedback, and performance analysis to develop the rolling program.

To illustrate the content of a RBIM study, the case of an ammonia production plant tank is presented in the third section only in terms of risk-based inspection techniques. The inspection program is developed further, with detailed supporting documentation.

The fourth section provides a comparative assessment of the advantages and disadvantages of RBIM. It concludes with recommendations for the implementation of RBIM and prospects for improvements within the framework of the definitive EN 16991 standard.

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Safety and risk management

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
CWA-RBIM risk- and reliability-based maintenance method