1. Origin and objectives of the CWA-RBIF method
1.1 Origin
The origin of the CWA-RBIM maintenance method stems from the European industrial community's desire for a risk- and reliability-based maintenance method, based on European maintenance and operational safety standards. In 2001, the European research project RIMAP "Risk-Based Inspection and Maintenance Procedures for European Industry" (GIRD-CT-2001-03008) was initiated . The aim of this project was to develop a systematic procedure for managing risk by identifying and prioritizing inspection and maintenance activities, as a basis for establishing a specific...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Maintenance
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Origin and objectives of the CWA-RBIF method
Bibliography
Software tools
RBI 10 : Risk-Based Inspection (RBI) Software, Reliasoft, 1450 S. Eastside Loop, Tucson, AZ 85710-6703, United States
Standards and norms
- Risk-Based Inspection and Maintenance Procedures for European Industry (RIMAP) - CEN CWA 15740 - 2008
- Risk-based Inspection Framework (RBIF) - CEN DRAFT prEN 16991 - 2016
- Risk management – Risk assessment techniques - IEC 31010 - 2009
- Safety aspects – Guidelines for including them in standards - ISO/CEI GUIDE 51 - 2014
- Risk management – Vocabulary - ISO/CEI GUIDE 73 - 2009
- Maintenance...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference