Article | REF: W6601 V2

On-site sanitation

Authors: Roger LACASSE, Siegfried MAUNOIR, Yan GILBERT, Cécile FAVRE, Charlotte TROADEC

Publication date: August 10, 2024

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

4. Lifting stations

Where gravity flow of wastewater cannot be ensured due to the characteristics of the site, a lifting station may be required to lift raw wastewater upstream of primary treatment, pre-treated wastewater upstream of secondary treatment, or treated wastewater downstream of the ANC system for discharge. Irrespective of their location, lift stations must meet the following requirements:

  • specifications of the NF EN 12050 series of standards (maximum pit test deformation of 7.5%, tightness of substation, connections and access cover). The standard NF EN 12050-1 concerns raw sewage treatment plants and the norme NF EN 12050-2 applies to other items;

  • IP68-rated pump and...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Water technologies

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Lifting stations
Outline