5. Detailed risk analysis (ADR)
5.1 Objective
The purpose of the ADR is to carry out a detailed study of the hazardous phenomena likely to lead to a major accident, i.e. those whose effects are likely to go beyond the plant's boundaries, and for which the level of risk of the P/G pairing justifies an additional analysis. The aim is to provide a more detailed characterization of the probability of occurrence, severity and kinetics of hazardous phenomena likely to lead to a major accident.
Tip: from a practical point of view, unlike the RPA, this phase of the risk analysis does not necessarily have to be carried out in a working group. On the other hand, the expertise of the working group set up during the RPA is required for certain stages of the RRA, such...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Environment
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Detailed risk analysis (ADR)
Bibliography
- (1) - Rapport INERIS - Synthèse des exclusions des accidents majeurs, phénomènes dangereux et de leurs causes, des Plans Particuliers d'Intervention, de la démarche de Mesure de Maîtrise des Risques et des Plans de Prévention des Risques Technologiques - Rapport DRA-09-1 03142-12236 A (07/10/2009).
- ...
Digital media
ARIA – Technological accident database.
French Ministry of Ecology, Energy, Sustainable Development and Town and Country Planning (MEEDDAT)
Regulations
Arrêté ministériel du 29 septembre 2005 relatif à l'évaluation et à la prise en compte de la probabilité d'occurrence, de la cinétique et de l'intensité des effets et de la gravité des conséquences des accidents potentiels dans les études de dangers des IC soumises à autorisation.
Circular dated May 10, 2010 summarizing the methodological rules applicable to hazard studies, risk reduction at source...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference