1. Requirements acquisition phase
1.1 Presentation
The first phase (figure 1 ), which can be called the requirements analysis (or acquisition) process, is a four-stage process (figure 2 ):
1. elucidation of requirements ;
2. requirements analysis (negotiation) ;
3. requirements documentation ;
4. verification.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Control and systems engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Requirements acquisition phase
Bibliography
Events
ERTSS Embedded Real Time Software and System
ESREL
LambdaMU
...
Standards and norms
- CENELEC, Applications ferroviaires. Spécification et démonstration de la fiabilité, de la disponibilité, de la maintenabilité et de la sécurité (FMDS). - NF EN 50126 - janvier 2000
- ISO, Quality management systems – Requirement. - ISO 9001 :2008 - Décembre 2000
- IEC, Sécurité fonctionnelle des systèmes électriques électroniques programmables relatifs à la sécurité, norme internationale. - IEC 61508 - 2008 ...
Directory
Manufacturers – Suppliers – Distributors (non-exhaustive list)
APTE
Organizations – Federations – Associations (non-exhaustive list)
AFIS
...Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference