Article | REF: S8006 V2

Multi-site MES application – Case study: SARIA Group's BIOPROD project

Author: Philippe ALLOT

Publication date: March 10, 2021

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Project sites

The project involves more than twenty sites. While some have very similar processes, they can also be very different. So we're in no way talking about an "identical" deployment. To illustrate this a little better, we'll take two examples from among the sites installed, and give an idea of the different levels of automation encountered at different sites.

2.1 Meat grinding process

SCROLL TO TOP

2.1.1 General

A crushing production order (PO) is used to crush the raw materials (RM) from the bins stored in...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Control and systems engineering

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Project sites