6. Representative example
The model was validated on two installations:
1) a mess hall (including a 1,000 square metre hall) serving a military base (figure 1 );
2) a teaching facility, comprising two conference halls.
The aim of the central building unit at the Ministry of Defense, which maintains these facilities, was to rehabilitate them to a level not exceeding 1.2 million NIS (New Israeli Shekel) during the coming calendar year.
The local unit required additional constraints, concerning the plant's performance level and service life, as follows:
1) Refurbishment must enable these two buildings to be used at an average but still acceptable level of performance (3 on a scale of 5);
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Control and systems engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Representative example
References
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference