Article | REF: S8104 V1

IT contracts

Author: Sylvie JONAS

Publication date: December 10, 2005

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

3. Contract performance

Now that we've looked at the contract drafting and conclusion phase, it's time to turn our attention to contract performance. First of all, it should be remembered that if the parties have cooperated loyally during the pre-contractual phase, and have taken all due care when drawing up the contract, the risk of conflicts arising during its execution is reduced. This is why we strongly recommend that you seek advice on drafting a contract that offers the best guarantees of legal certainty for both parties. Firstly, we'll look at the delivery and acceptance phase 3.1 , then we'll look at the start-up phase and the training...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Control and systems engineering

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Contract performance