Article | REF: TRP5005 V1

Dredging of Maritime Approach and Harbour Channels. Management of Dredged Sediments

Author: Sylvain HAUVILLE

Publication date: March 10, 2020

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

2. Dredging process

The dredging process comprises three successive stages: excavation, transport and discharge or land disposal of materials.

It is possible for a single device to perform all three operations. On the contrary, sometimes three different pieces of equipment are required for extraction (dredger), transport (barges, hydraulic pipes) and discharge or disposal of the materials (dozer, elevator).

In addition, for certain special jobs on hard ground, it is necessary to loosen the material prior to extraction.

2.1 Dredging phase

This phase involves the excavation and extraction of sediment from the bottom beneath the water body. A special machine – the dredger – is used to excavate, pick up or move the sediment, either...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Transport fluvial et maritime

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Dredging process