2. Application of the structured and shared drawing method to five projects
Five project examples are presented below: four successes and one failure.
2.1 Freeway construction in a conurbation of 10 million inhabitants
2.1.1 Background to the resumption of a shutdown project
Construction of a twenty-kilometre urban freeway was interrupted in the middle of the worksite in the city of V. The purpose of the contract is to take over the worksite as it stands and complete it rapidly. The contracts of some of the original players have been retained and reactivated, with the...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Management and innovation engineering
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Application of the structured and shared drawing method to five projects
Bibliography
Videos
Rousseau Frédéric – TEDx The Tissage de ruptures urbaines method for taking action in your neighborhood – https://tedxissylesmoulineaux.com/portfolio/frederic-rousseau
Rousseau Frédéric – Project: the system approach: man tools procedures immersed in an environment –
Websites
http://chaire-changement.essec.edu/
https://www.manager-go.com/gestion-de-projet/conduite-du-changement.htm
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference