Article | REF: M7410 V1

Blast furnace - Design and technology

Author: Maurice BURTEAUX

Publication date: April 10, 1992

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


Français

4. Future of the blast furnace

4.1 Dimensional evolution

Between 1965 and 1976 [2] , the internal volume of the largest units commissioned rose from 2,000 to 5,000 m 3 (HF2 at Oïta and HF3 at Kashima); all blast furnaces commissioned since then, with the exception of HF5 at Tcherepovetz in the USSR (5,580 m 3 ), have an internal volume of less than 4,800 m 3 (4,350 m 3 on average for those over 4,000). There has therefore been an undeniable slowdown in the development of blast furnace dimensions, and this leads us to believe that further growth is unlikely; the reasons...

You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Metal manufacturing processes and recycling

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Future of the blast furnace