3. Economic aspects
3.1 Capital cost of a large blast furnace
Blast furnace 14 m in diameter at 1991 economic conditions.
There is currently only one project of this size; the cost range would be 770 to 1,000 MDM, or 2,600 to 3,400 MF. The range is in line with the costing of a preliminary design.
In addition, an installation cost (table 6 ) was calculated, based on the detailed cost of a retrofit. The percentage replaced for each item of equipment was estimated, enabling the total cost to be calculated. This total price is valid for a blast furnace equipped with the annexes described above and capable of running for 10 to 12 years. The cost per annual tonne installed (investment / annual production)...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
![](/assets/images/logo-eti-KGYj7ZH.png)
The Ultimate Scientific and Technical Reference
This article is included in
Metal manufacturing processes and recycling
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Economic aspects
Bibliography
Article references
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
![](/assets/images/logo-eti-KGYj7ZH.png)
The Ultimate Scientific and Technical Reference