2. Installation and start-up
2.1 Assembly and start-up personnel
Machine builders and suppliers make a number of engineers and technicians available on site for equipment assembly and start-up.
Foundry engineering also involves determining the number and qualifications of in-house personnel needed to operate and maintain the new facilities.
In order to ensure optimum start-up of new installations, this staff must be trained. This, of course, makes commissioning easier and quicker. This training is linked to :
equipment and technologies;
operation and maintenance of new facilities.
It is particularly...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Metal forming and foundry
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Installation and start-up
Bibliography
Standards
Directive (EU) 2018/2002 of the European Parliament and of the Council of December 11, 2018 amending Directive 2012/27/EU on energy efficiency – Note explaining the ICPE nomenclature for waste management and treatment facilities – DGPR – April 27, 2022.
Arrêté relatif aux installations d'incinération et de co-incinération de déchets dangereux – September 20, 2002.
European Parliament...
Directories
Merger
Inductotherm Group https://inductotherm–group–france.fr/
Otto Junker GMBH https://www.otto–junker.com/en
...Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference